{"ok": true, "database": "intermediate", "table": "repd", "rows": [{"rowid": 100, "repd_project_id": "repd_project_99", "operator": "centrica", "site_name": "roosecote biomass", "technology_type": "biomass (dedicated)", "installed_capacity": 80.0, "development_status": "application withdrawn", "address": "roosecote near barrowin- furness, cumbria. roosecote", "county": "cumbria", "region": "north west", "country": "england", "postcode": "0", "longitude": -3.189080493406181, "latitude": 54.10515113624058, "planning_authority": "the planning inspectorate - national infrastructure", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "0", "source": "gov_uk", "location": "roosecote biomass"}], "primary_keys": ["rowid"], "primary_key_values": ["100"], "query_ms": 18.429284915328026, "truncated": false}