{"ok": true, "database": "intermediate", "table": "repd", "rows": [{"rowid": 31, "repd_project_id": "repd_project_30", "operator": "private developer", "site_name": "brigg renewable energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "revised", "address": "british sugar corporation ltd, access roads to power station, scawby", "county": "humberside", "region": "yorkshire and humber", "country": "england", "postcode": "dn20 9lt", "longitude": -0.5096090564756909, "latitude": 53.54232796852933, "planning_authority": "north lincolnshire", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "0", "source": "gov_uk", "location": "brigg renewable energy plant"}], "primary_keys": ["rowid"], "primary_key_values": ["31"], "query_ms": 14.825001824647188, "truncated": false}