{"ok": true, "database": "intermediate", "table": "repd", "rows": [{"rowid": 66, "repd_project_id": "repd_project_65", "operator": "epr corby / aztec energy", "site_name": "corby biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 14.3, "development_status": "abandoned", "address": "corby biomass plant, phoenix parkway, corby", "county": "northamptonshire", "region": "east midlands", "country": "england", "postcode": "0", "longitude": -0.6783170707286418, "latitude": 52.50860736609464, "planning_authority": "north northamptonshire", "date_permission_granted": "2001-04-01", "date_under_construction": "0", "date_operational": "0", "source": "gov_uk", "location": "corby biomass plant"}], "primary_keys": ["rowid"], "primary_key_values": ["66"], "query_ms": 15.18002594821155, "truncated": false}