{"ok": true, "next": "100", "rows": [{"rowid": 1, "repd_project_id": "repd_project_0", "operator": "rwe npower", "site_name": "aberthaw power station biomass", "technology_type": "biomass (co-firing)", "installed_capacity": 35.0, "development_status": "decommissioned", "address": "aberthaw power station, the leys, aberthaw barry", "county": "south glamorgan", "region": "wales", "country": "wales", "postcode": "cf62 4zw", "longitude": -3.4066095120083357, "latitude": 51.38747061309072, "planning_authority": "vale of glamorgan", "date_permission_granted": "2004-09-03", "date_under_construction": "2006-05-01", "date_operational": "2007-05-01", "source": "gov_uk", "location": "aberthaw power station biomass", "ecr_project_id": "nged_emids_ecr_project_908"}, {"rowid": 2, "repd_project_id": "repd_project_2", "operator": "scottish and southern energy (sse)", "site_name": "ferrybridge multifuel 2 (fm2)", "technology_type": "efw incineration", "installed_capacity": 70.0, "development_status": "operational", "address": "0", "county": "west yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -1.2818852350690881, "latitude": 53.71641723929932, "planning_authority": "the planning inspectorate - national infrastructure", "date_permission_granted": "2015-10-28", "date_under_construction": "2016-09-01", "date_operational": "2019-12-20", "source": "gov_uk", "location": "ferrybridge multifuel", "ecr_project_id": "enw__ecr_project_26"}, {"rowid": 3, "repd_project_id": "repd_project_3", "operator": "energy power resources", "site_name": "thetford biomass power station", "technology_type": "biomass (dedicated)", "installed_capacity": 38.5, "development_status": "operational", "address": "thetford power station\n, marley building materials site\n, two mile bottom,\nmundford road, thetford ,\nnorfolk", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 0.7252726989252509, "latitude": 52.44862816984887, "planning_authority": "breckland", "date_permission_granted": "1995-05-05", "date_under_construction": "0", "date_operational": "1998-10-02", "source": "gov_uk", "location": "thetford biomass power station", "ecr_project_id": "ukpn_epn_ecr_project_102"}, {"rowid": 4, "repd_project_id": "repd_project_13", "operator": "dalkia", "site_name": "chilton energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 18.0, "development_status": "operational", "address": "chilton industrial estate, chilton, ferryhill,", "county": "county durham", "region": "north east", "country": "england", "postcode": "0", "longitude": -1.5666318523581944, "latitude": 54.66802704015, "planning_authority": "county durham", "date_permission_granted": "2009-11-24", "date_under_construction": "2010-03-01", "date_operational": "2012-03-12", "source": "gov_uk", "location": "chilton energy plant", "ecr_project_id": "0"}, {"rowid": 5, "repd_project_id": "repd_project_16", "operator": "double h nurseries", "site_name": "double h nurseries biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 1.5, "development_status": "operational", "address": "double h nurseries, gore road, new milton", "county": "hampshire", "region": "south east", "country": "england", "postcode": "bh25 5nq", "longitude": -1.6781191025064066, "latitude": 50.7507820194218, "planning_authority": "new forest", "date_permission_granted": "2012-05-29", "date_under_construction": "0", "date_operational": "2012-12-15", "source": "gov_uk", "location": "double h nurseries biomass plant", "ecr_project_id": "0"}, {"rowid": 6, "repd_project_id": "repd_project_17", "operator": "react energy (kedco)", "site_name": "newry biomass phase 1 (gasification)", "technology_type": "advanced conversion technologies", "installed_capacity": 2.0, "development_status": "operational", "address": "newry", "county": "co. down", "region": "northern ireland", "country": "northern ireland", "postcode": "0", "longitude": -6.336669144281395, "latitude": 54.2175068933632, "planning_authority": "newry, mourne and down", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2012-06-27", "source": "gov_uk", "location": "newry biomass phase", "ecr_project_id": "nged_swest_ecr_project_4188"}, {"rowid": 7, "repd_project_id": "repd_project_18", "operator": "balfour beatty", "site_name": "beckton stw biodiesel power plant", "technology_type": "biomass (dedicated)", "installed_capacity": 8.0, "development_status": "operational", "address": "beckton sewage treatment works jenkins lane east ham london", "county": "london", "region": "london", "country": "england", "postcode": "ig11 0ad", "longitude": 0.09346150714755841, "latitude": 51.51777682481655, "planning_authority": "newham", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2010-12-01", "source": "gov_uk", "location": "beckton  biodiesel power plant", "ecr_project_id": "0"}, {"rowid": 8, "repd_project_id": "repd_project_19", "operator": "living power (reg bio-power)", "site_name": "buslingthorpe power station (leeds north)", "technology_type": "biomass (dedicated)", "installed_capacity": 2.0, "development_status": "operational", "address": "penraevon industrial estate, buslingthorpe green, leeds", "county": "west yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "ls7 2hg", "longitude": -1.5426149979781192, "latitude": 53.814326540186414, "planning_authority": "leeds", "date_permission_granted": "2010-12-30", "date_under_construction": "0", "date_operational": "2011-10-14", "source": "gov_uk", "location": "buslingthorpe power station leeds north", "ecr_project_id": "npg23-001565"}, {"rowid": 9, "repd_project_id": "repd_project_21", "operator": "balcas", "site_name": "invergordon pellet mill", "technology_type": "biomass (dedicated)", "installed_capacity": 5.0, "development_status": "operational", "address": "invergordon, ross-shire", "county": "highland", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -4.159926948232918, "latitude": 57.70539165399964, "planning_authority": "highland", "date_permission_granted": "2007-04-16", "date_under_construction": "0", "date_operational": "2009-11-01", "source": "gov_uk", "location": "invergordon pellet mill", "ecr_project_id": "ukpn_spn_ecr_project_393"}, {"rowid": 10, "repd_project_id": "repd_project_23", "operator": "balcas timber", "site_name": "balcas timber biomass chp plant", "technology_type": "biomass (dedicated)", "installed_capacity": 2.5, "development_status": "operational", "address": "balcas timber ltd, laragh, enniskillen, co. fermanagh", "county": "co. fermanagh", "region": "northern ireland", "country": "northern ireland", "postcode": "bt94 2fq", "longitude": -7.66394293956149, "latitude": 54.30732796895875, "planning_authority": "fermanagh and omagh", "date_permission_granted": "2004-06-01", "date_under_construction": "0", "date_operational": "2005-11-14", "source": "gov_uk", "location": "balcas timber biomass chp plant", "ecr_project_id": "0"}, {"rowid": 11, "repd_project_id": "repd_project_24", "operator": "caledonian paper", "site_name": "caledonian papermill", "technology_type": "biomass (dedicated)", "installed_capacity": 26.0, "development_status": "operational", "address": "meadowhead road, shewalton, irvine", "county": "strathclyde", "region": "scotland", "country": "scotland", "postcode": "ka11 5at", "longitude": -4.639538748255496, "latitude": 55.57964477561989, "planning_authority": "north ayrshire", "date_permission_granted": "2006-07-11", "date_under_construction": "0", "date_operational": "2009-06-04", "source": "gov_uk", "location": "caledonian papermill", "ecr_project_id": "0"}, {"rowid": 12, "repd_project_id": "repd_project_25", "operator": "uk wood recycling", "site_name": "wilton international", "technology_type": "biomass (dedicated)", "installed_capacity": 35.2, "development_status": "operational", "address": "wilton international, po box 1985, wilton, middlesbrough, cleveland", "county": "cleveland", "region": "north east", "country": "england", "postcode": "ts90 8ws", "longitude": -1.0967260930948521, "latitude": 54.56735093089087, "planning_authority": "redcar and cleveland", "date_permission_granted": "2006-11-07", "date_under_construction": "2006-11-08", "date_operational": "2007-03-26", "source": "gov_uk", "location": "wilton international", "ecr_project_id": "0"}, {"rowid": 13, "repd_project_id": "repd_project_26", "operator": "bioflame", "site_name": "south view farm", "technology_type": "biomass (dedicated)", "installed_capacity": 2.0, "development_status": "operational", "address": "south view farm\r, yatts\r, pickering", "county": "north yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -0.7585731053982055, "latitude": 54.27032216540648, "planning_authority": "north yorkshire", "date_permission_granted": "2006-10-24", "date_under_construction": "0", "date_operational": "2007-10-01", "source": "gov_uk", "location": "south view farm", "ecr_project_id": "0"}, {"rowid": 14, "repd_project_id": "repd_project_29", "operator": "norbord", "site_name": "cowie biomass facility", "technology_type": "biomass (dedicated)", "installed_capacity": 15.0, "development_status": "operational", "address": "norbord ltd, station road, cowie,", "county": "stirling", "region": "scotland", "country": "scotland", "postcode": "fk7 7bw", "longitude": -3.863920687864198, "latitude": 56.076885380402956, "planning_authority": "stirling", "date_permission_granted": "2006-07-27", "date_under_construction": "0", "date_operational": "2008-02-01", "source": "gov_uk", "location": "cowie biomass facility", "ecr_project_id": "0"}, {"rowid": 15, "repd_project_id": "repd_project_32", "operator": "tps (uk)", "site_name": "thornton power station", "technology_type": "biomass (dedicated)", "installed_capacity": 9.0, "development_status": "operational", "address": "wyre", "county": "lancashire", "region": "north west", "country": "england", "postcode": "0", "longitude": -2.9975020662798593, "latitude": 53.88194737654642, "planning_authority": "wyre", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2002-06-15", "source": "gov_uk", "location": "thornton power station", "ecr_project_id": "0"}, {"rowid": 16, "repd_project_id": "repd_project_33", "operator": "a c shropshire ltd", "site_name": "green's lodge farm", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "a c shropshire ltd, green's lodge farm, forest road, huncote", "county": "leicestershire", "region": "east midlands", "country": "england", "postcode": "le67 4uy", "longitude": -1.31248912541172, "latitude": 52.723993966537, "planning_authority": "north west leicestershire", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2013-05-14", "source": "gov_uk", "location": "green's lodge farm", "ecr_project_id": "nged_emids_ecr_project_885"}, {"rowid": 17, "repd_project_id": "repd_project_34", "operator": "iggesund paperboard (workington)", "site_name": "iggesund paperboard chp plant", "technology_type": "biomass (dedicated)", "installed_capacity": 49.0, "development_status": "operational", "address": "siddick, workington, cumbria", "county": "cumbria", "region": "north west", "country": "england", "postcode": "ca14 1jx", "longitude": -3.5473310650198666, "latitude": 54.66397639977084, "planning_authority": "cumberland", "date_permission_granted": "2011-03-08", "date_under_construction": "0", "date_operational": "2013-02-17", "source": "gov_uk", "location": "iggesund paperboard chp plant", "ecr_project_id": "0"}, {"rowid": 18, "repd_project_id": "repd_project_36", "operator": "ancillary components", "site_name": "goosey lodge industrial estate", "technology_type": "biomass (dedicated)", "installed_capacity": 16.0, "development_status": "operational", "address": "goosey lodge industrial estate\r, wymington\r, rushden\r, northamptonshire", "county": "bedfordshire", "region": "eastern", "country": "england", "postcode": "nn10 9lu", "longitude": -0.5993551681750761, "latitude": 52.020712860705245, "planning_authority": "central bedfordshire", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2000-12-31", "source": "gov_uk", "location": "goosey lodge industrial estate", "ecr_project_id": "nged_emids_ecr_project_613"}, {"rowid": 19, "repd_project_id": "repd_project_43", "operator": "western bioenergy, affiliate of western log", "site_name": "western wood energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 14.0, "development_status": "operational", "address": "longlands lane,\r margam,\r nr junction 38 of the m4.", "county": "west glamorgan", "region": "wales", "country": "wales", "postcode": "0", "longitude": -3.7626210555485953, "latitude": 51.56753953504322, "planning_authority": "neath port talbot", "date_permission_granted": "2004-04-27", "date_under_construction": "2006-11-01", "date_operational": "2009-11-01", "source": "gov_uk", "location": "western wood energy plant", "ecr_project_id": "nged_swales_ecr_project_3353"}, {"rowid": 20, "repd_project_id": "repd_project_44", "operator": "eccleshal biomass", "site_name": "eccleshall biomass", "technology_type": "biomass (dedicated)", "installed_capacity": 2.6, "development_status": "operational", "address": "land adjacent to raleigh ind. estate,\r sturbridge\r, eccleshal", "county": "staffordshire", "region": "west midlands", "country": "england", "postcode": "st21 6jl", "longitude": -2.246724783608759, "latitude": 52.874647998240654, "planning_authority": "stafford", "date_permission_granted": "2003-10-29", "date_under_construction": "2006-05-01", "date_operational": "2007-09-12", "source": "gov_uk", "location": "eccleshall biomass", "ecr_project_id": "nged_wmids_ecr_project_2202"}, {"rowid": 21, "repd_project_id": "repd_project_47", "operator": "epr scotland", "site_name": "westfield biomass power station", "technology_type": "biomass (dedicated)", "installed_capacity": 12.5, "development_status": "operational", "address": "westfield development centre, fife", "county": "fife", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.3051099410682068, "latitude": 56.14170091124371, "planning_authority": "fife", "date_permission_granted": "1995-12-05", "date_under_construction": "0", "date_operational": "2000-08-21", "source": "gov_uk", "location": "westfield biomass power station", "ecr_project_id": "0"}, {"rowid": 22, "repd_project_id": "repd_project_48", "operator": "plymouth hospital nhs trust", "site_name": "derriford hospital", "technology_type": "biomass (dedicated)", "installed_capacity": 1.5, "development_status": "operational", "address": "derriford hospital, derriford road, derriford, plymouth,", "county": "devon", "region": "south west", "country": "england", "postcode": "pl6 8dh", "longitude": -4.113684475426827, "latitude": 50.416719948823165, "planning_authority": "plymouth", "date_permission_granted": "2013-12-10", "date_under_construction": "2014-07-10", "date_operational": "2014-10-01", "source": "gov_uk", "location": "derriford hospital", "ecr_project_id": "0"}, {"rowid": 23, "repd_project_id": "repd_project_50", "operator": "cofely", "site_name": "rampton hospital energy centre", "technology_type": "biomass (dedicated)", "installed_capacity": 1.2, "development_status": "operational", "address": "retford,", "county": "nottinghamshire", "region": "east midlands", "country": "england", "postcode": "dn22 0pd", "longitude": -0.8382125884467737, "latitude": 53.29038534480032, "planning_authority": "bassetlaw", "date_permission_granted": "2013-02-06", "date_under_construction": "2015-02-01", "date_operational": "2015-05-29", "source": "gov_uk", "location": "rampton hospital energy centre", "ecr_project_id": "enw__ecr_project_212"}, {"rowid": 24, "repd_project_id": "repd_project_52", "operator": "oak grove renewables", "site_name": "oak grove biomass facility", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "oak grove, scottow, norwich,", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "nr10 4du", "longitude": 1.3564188800579515, "latitude": 52.768629939523784, "planning_authority": "north norfolk", "date_permission_granted": "2012-09-25", "date_under_construction": "0", "date_operational": "2014-03-01", "source": "gov_uk", "location": "oak grove biomass facility", "ecr_project_id": "ukpn_epn_ecr_project_812"}, {"rowid": 25, "repd_project_id": "repd_project_56", "operator": "lockwood estates", "site_name": "land at grange farm", "technology_type": "anaerobic digestion", "installed_capacity": 1.1, "development_status": "operational", "address": "cliff road, spridlington, market rasen", "county": "lincolnshire", "region": "east midlands", "country": "england", "postcode": "ln8 2dn", "longitude": -0.5362871852437249, "latitude": 53.33610925114849, "planning_authority": "west lindsey", "date_permission_granted": "2013-06-04", "date_under_construction": "2013-12-01", "date_operational": "2014-12-01", "source": "gov_uk", "location": "land at grange farm", "ecr_project_id": "npg23-001983"}, {"rowid": 26, "repd_project_id": "repd_project_60", "operator": "european development corporation", "site_name": "elean business park biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "operational", "address": "elean business park sutton cambridgeshire", "county": "cambridgeshire", "region": "eastern", "country": "england", "postcode": "0", "longitude": 0.12972987690758278, "latitude": 52.397914571699275, "planning_authority": "east cambridgeshire", "date_permission_granted": "1996-02-22", "date_under_construction": "0", "date_operational": "2000-09-22", "source": "gov_uk", "location": "elean business park biomass plant", "ecr_project_id": "0"}, {"rowid": 27, "repd_project_id": "repd_project_63", "operator": "south western power (novera)", "site_name": "eye biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 14.3, "development_status": "operational", "address": "eye biomass plant\r, eye airfield, site a\r, eye suffolk", "county": "suffolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 1.1277608635328502, "latitude": 52.33343741656932, "planning_authority": "mid suffolk", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "1992-07-01", "source": "gov_uk", "location": "eye biomass plant", "ecr_project_id": "0"}, {"rowid": 28, "repd_project_id": "repd_project_67", "operator": "suez energy services", "site_name": "king's yard", "technology_type": "biomass (dedicated)", "installed_capacity": 3.0, "development_status": "operational", "address": "carpenters road,", "county": "london", "region": "london", "country": "england", "postcode": "e15 2jh", "longitude": -0.005578513994198582, "latitude": 51.53586045587667, "planning_authority": "newham", "date_permission_granted": "2009-03-10", "date_under_construction": "2009-05-01", "date_operational": "2012-07-25", "source": "gov_uk", "location": "king's yard", "ecr_project_id": "0"}, {"rowid": 29, "repd_project_id": "repd_project_83", "operator": "mvv energie, ridham dock", "site_name": "ridham chp plant", "technology_type": "biomass (dedicated)", "installed_capacity": 25.0, "development_status": "operational", "address": "ridham dock, iwade, sittingbourne,", "county": "kent", "region": "south east", "country": "england", "postcode": "me9 8sr", "longitude": 0.7588220297660605, "latitude": 51.38233130377889, "planning_authority": "swale", "date_permission_granted": "2012-05-28", "date_under_construction": "2013-04-08", "date_operational": "2016-04-18", "source": "gov_uk", "location": "ridham chp plant", "ecr_project_id": "0"}, {"rowid": 30, "repd_project_id": "repd_project_87", "operator": "glennmont partners", "site_name": "port clarence biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "under construction", "address": "port clarence road, port clarence,", "county": "cleveland", "region": "north east", "country": "england", "postcode": "0", "longitude": -1.2307324739349312, "latitude": 54.587778612934386, "planning_authority": "stockton-on-tees", "date_permission_granted": "2010-02-23", "date_under_construction": "2015-11-17", "date_operational": "0", "source": "gov_uk", "location": "port clarence biomass plant", "ecr_project_id": "0"}, {"rowid": 31, "repd_project_id": "repd_project_89", "operator": "glennmont partners", "site_name": "margam green energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "operational", "address": "longlands lane, margam, port talbot", "county": "west glamorgan", "region": "wales", "country": "wales", "postcode": "0", "longitude": -3.747885446992546, "latitude": 51.563308821454704, "planning_authority": "neath port talbot", "date_permission_granted": "2011-03-08", "date_under_construction": "2015-02-15", "date_operational": "2017-12-01", "source": "gov_uk", "location": "margam green energy plant", "ecr_project_id": "0"}, {"rowid": 32, "repd_project_id": "repd_project_90", "operator": "merevale and blyth estates", "site_name": "merevale & blyth estate (biomass plant)", "technology_type": "biomass (dedicated)", "installed_capacity": 2.5, "development_status": "operational", "address": "merevale lane, atherstone,", "county": "warwickshire", "region": "west midlands", "country": "england", "postcode": "cv9 2la", "longitude": -1.586703831680865, "latitude": 52.57165798198684, "planning_authority": "north warwickshire", "date_permission_granted": "2011-03-28", "date_under_construction": "2014-08-28", "date_operational": "2015-03-28", "source": "gov_uk", "location": "merevale   blyth estate biomass plant", "ecr_project_id": "0"}, {"rowid": 33, "repd_project_id": "repd_project_91", "operator": "lynemouth power", "site_name": "lynemouth power station", "technology_type": "biomass (dedicated)", "installed_capacity": 420.0, "development_status": "operational", "address": "woodhorn ashington northumberland", "county": "northumberland", "region": "north east", "country": "england", "postcode": "ne63 9yh", "longitude": -1.532504001976289, "latitude": 55.20672173325934, "planning_authority": "northumberland", "date_permission_granted": "2015-03-06", "date_under_construction": "2016-01-01", "date_operational": "2018-11-21", "source": "gov_uk", "location": "lynemouth power station", "ecr_project_id": "npg15-000001"}, {"rowid": 34, "repd_project_id": "repd_project_92", "operator": "scottish and southern energy (sse)", "site_name": "ferrybridge multifuel 1 (fm1)", "technology_type": "efw incineration", "installed_capacity": 68.0, "development_status": "operational", "address": "ferrybridge c power station, po box 39, stranglands lane, knottingley,", "county": "west yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "wf11 8sq", "longitude": -1.2818852350690881, "latitude": 53.71641723929932, "planning_authority": "wakefield", "date_permission_granted": "2011-10-31", "date_under_construction": "2012-10-01", "date_operational": "2015-08-03", "source": "gov_uk", "location": "ferrybridge multifuel", "ecr_project_id": "0"}, {"rowid": 35, "repd_project_id": "repd_project_93", "operator": "uye (uk) / veolia", "site_name": "holbrook community renewable energy centre", "technology_type": "biomass (dedicated)", "installed_capacity": 6.5, "development_status": "operational", "address": "land at rear of hadee engineering co ltd, rother valley way, holbrook, sheffield", "county": "south yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "s20 3gh", "longitude": -1.332311180252399, "latitude": 53.33081240267397, "planning_authority": "sheffield", "date_permission_granted": "2012-09-25", "date_under_construction": "2015-07-17", "date_operational": "2017-04-24", "source": "gov_uk", "location": "holbrook community renewable energy centre", "ecr_project_id": "nged_emids_ecr_project_1312"}, {"rowid": 36, "repd_project_id": "repd_project_94", "operator": "alternative use group plc & alchemy farms", "site_name": "riverside industrial estate gasification plant", "technology_type": "advanced conversion technologies", "installed_capacity": 10.5, "development_status": "operational", "address": "land at riverside industrial estate, marsh lne, boston,", "county": "lincolnshire", "region": "east midlands", "country": "england", "postcode": "0", "longitude": -0.012939079273559822, "latitude": 52.957225975990184, "planning_authority": "boston", "date_permission_granted": "2010-09-07", "date_under_construction": "2016-04-04", "date_operational": "2018-03-15", "source": "gov_uk", "location": "riverside industrial estate gasification plant", "ecr_project_id": "nged_emids_ecr_project_1107"}, {"rowid": 37, "repd_project_id": "repd_project_96", "operator": "enviroparks operations", "site_name": "enviroparks hirwaun generation site", "technology_type": "advanced conversion technologies", "installed_capacity": 20.0, "development_status": "operational", "address": "fifth avenue, hirwaun industrial estate, hirwaun, aberdare,", "county": "mid glamorgan", "region": "wales", "country": "wales", "postcode": "cf44 9yn", "longitude": -3.538986661345232, "latitude": 51.750094020574444, "planning_authority": "rhondda cynon taf", "date_permission_granted": "2010-12-21", "date_under_construction": "2016-02-18", "date_operational": "2019-09-01", "source": "gov_uk", "location": "enviroparks hirwaun generation", "ecr_project_id": "nged_emids_ecr_project_1034"}, {"rowid": 38, "repd_project_id": "repd_project_97", "operator": "estover energy", "site_name": "cramlington chp", "technology_type": "biomass (dedicated)", "installed_capacity": 27.7, "development_status": "operational", "address": "windmill industrial estate, cramlington,", "county": "northumberland", "region": "north east", "country": "england", "postcode": "ne23 1jy", "longitude": -1.620629321573954, "latitude": 55.0969399615995, "planning_authority": "northumberland", "date_permission_granted": "2013-01-21", "date_under_construction": "2015-09-01", "date_operational": "2018-03-15", "source": "gov_uk", "location": "cramlington chp", "ecr_project_id": "0"}, {"rowid": 39, "repd_project_id": "repd_project_98", "operator": "private developer", "site_name": "tyrone energy 1", "technology_type": "biomass (dedicated)", "installed_capacity": 2.1, "development_status": "operational", "address": "lands 3 art road artigarvan strabane", "county": "co. tyrone", "region": "northern ireland", "country": "northern ireland", "postcode": "bt82 0ha", "longitude": -7.406464392412203, "latitude": 54.85208565269308, "planning_authority": "derry city and strabane", "date_permission_granted": "2009-12-08", "date_under_construction": "2011-08-01", "date_operational": "2012-08-06", "source": "gov_uk", "location": "tyrone energy", "ecr_project_id": "0"}, {"rowid": 40, "repd_project_id": "repd_project_100", "operator": "ere developments", "site_name": "evermore renewable energy (chp) / lisahally power station", "technology_type": "biomass (dedicated)", "installed_capacity": 15.0, "development_status": "operational", "address": "site between temple road and maydown road, lisahally opposite location of former dwelling 38 temple road,", "county": "co. derry / londonderry", "region": "northern ireland", "country": "northern ireland", "postcode": "bt47 6fl", "longitude": -7.251206148132431, "latitude": 55.03462615322128, "planning_authority": "derry city and strabane", "date_permission_granted": "2010-07-09", "date_under_construction": "2013-12-19", "date_operational": "2015-07-23", "source": "gov_uk", "location": "evermore renewable energy chp   lisahally power station", "ecr_project_id": "0"}, {"rowid": 41, "repd_project_id": "repd_project_101", "operator": "e.on uk", "site_name": "ironbridge power station", "technology_type": "biomass (dedicated)", "installed_capacity": 740.0, "development_status": "decommissioned", "address": "buildwas road , telford", "county": "shropshire", "region": "west midlands", "country": "england", "postcode": "tf8 7bl", "longitude": -2.5121655379611862, "latitude": 52.63069259295462, "planning_authority": "shropshire", "date_permission_granted": "2012-04-05", "date_under_construction": "0", "date_operational": "2013-03-27", "source": "gov_uk", "location": "ironbridge power station", "ecr_project_id": "0"}, {"rowid": 42, "repd_project_id": "repd_project_103", "operator": "markley group", "site_name": "markley group (premiere kitckens) biomass", "technology_type": "biomass (dedicated)", "installed_capacity": 2.1, "development_status": "operational", "address": "unit q1, quadrant distribution centre, quadrant way, hardwicke, gloucester", "county": "gloucestershire", "region": "south west", "country": "england", "postcode": "gl2 2rn", "longitude": -2.2820428698467468, "latitude": 51.81014798498943, "planning_authority": "stroud", "date_permission_granted": "2011-08-03", "date_under_construction": "0", "date_operational": "2012-04-19", "source": "gov_uk", "location": "markley  premiere kitckens biomass", "ecr_project_id": "0"}, {"rowid": 43, "repd_project_id": "repd_project_105", "operator": "heathrow airport", "site_name": "heathrow airport biomass chp", "technology_type": "biomass (dedicated)", "installed_capacity": 1.8, "development_status": "operational", "address": "heathrow", "county": "london", "region": "london", "country": "england", "postcode": "0", "longitude": -0.45948018300038274, "latitude": 51.45921529365274, "planning_authority": "hillingdon", "date_permission_granted": "2010-05-25", "date_under_construction": "2012-06-01", "date_operational": "2013-01-01", "source": "gov_uk", "location": "heathrow airport biomass chp", "ecr_project_id": "0"}, {"rowid": 44, "repd_project_id": "repd_project_106", "operator": "reg bio-power", "site_name": "bentwaters chp", "technology_type": "biomass (dedicated)", "installed_capacity": 4.6, "development_status": "operational", "address": "bentwaters business park,", "county": "suffolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 1.4303464984967034, "latitude": 52.12994331650322, "planning_authority": "east suffolk", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2010-11-01", "source": "gov_uk", "location": "bentwaters chp", "ecr_project_id": "0"}, {"rowid": 45, "repd_project_id": "repd_project_107", "operator": "gdf suez energy uk", "site_name": "saica paper mill", "technology_type": "biomass (dedicated)", "installed_capacity": 41.6, "development_status": "operational", "address": "partington wharfside, land off manchester road, carrington", "county": "greater manchester", "region": "north west", "country": "england", "postcode": "0", "longitude": -2.4195173760440176, "latitude": 53.42510804372934, "planning_authority": "trafford", "date_permission_granted": "2008-12-30", "date_under_construction": "0", "date_operational": "2012-03-16", "source": "gov_uk", "location": "saica paper mill", "ecr_project_id": "0"}, {"rowid": 46, "repd_project_id": "repd_project_114", "operator": "eco sustainable solutions", "site_name": "eco composting", "technology_type": "biomass (dedicated)", "installed_capacity": 3.2, "development_status": "operational", "address": "chapel lane, parley, christchurch,", "county": "dorset", "region": "south west", "country": "england", "postcode": "bh23 6bg", "longitude": -1.8569003887279454, "latitude": 50.78597534562271, "planning_authority": "bournemouth, christchurch and poole", "date_permission_granted": "2011-07-26", "date_under_construction": "2016-10-28", "date_operational": "2017-03-22", "source": "gov_uk", "location": "eco composting", "ecr_project_id": "0"}, {"rowid": 47, "repd_project_id": "repd_project_115", "operator": "scottish bio-power", "site_name": "rothes bio-plant", "technology_type": "biomass (dedicated)", "installed_capacity": 8.3, "development_status": "operational", "address": "rothes distillery, speyside", "county": "grampian", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.2078005980231215, "latitude": 57.52641087294761, "planning_authority": "moray", "date_permission_granted": "2009-01-28", "date_under_construction": "2011-05-01", "date_operational": "2013-04-16", "source": "gov_uk", "location": "rothes bio plant", "ecr_project_id": "0"}, {"rowid": 48, "repd_project_id": "repd_project_118", "operator": "icon, eea holdings & 2oc consortium", "site_name": "beckton gas pressure reduction station", "technology_type": "biomass (dedicated)", "installed_capacity": 19.0, "development_status": "operational", "address": "beckton sewage treatment works", "county": "london", "region": "london", "country": "england", "postcode": "0", "longitude": 0.08850837908613798, "latitude": 51.51820685966397, "planning_authority": "newham", "date_permission_granted": "2010-08-26", "date_under_construction": "2013-04-30", "date_operational": "2015-03-30", "source": "gov_uk", "location": "beckton gas pressure reduction station", "ecr_project_id": "0"}, {"rowid": 49, "repd_project_id": "repd_project_123", "operator": "cogen", "site_name": "ince bio power", "technology_type": "advanced conversion technologies", "installed_capacity": 21.5, "development_status": "operational", "address": "plot 9, ince marshes ince reso, marsh lane, ince, chester,", "county": "cheshire", "region": "north west", "country": "england", "postcode": "ch2 4n", "longitude": -2.8188874683528797, "latitude": 53.28265722910755, "planning_authority": "cheshire west and chester", "date_permission_granted": "2011-09-09", "date_under_construction": "2015-10-29", "date_operational": "2017-04-30", "source": "gov_uk", "location": "ince bio power", "ecr_project_id": "0"}, {"rowid": 50, "repd_project_id": "repd_project_125", "operator": "eco2", "site_name": "brigg renewable energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "operational", "address": "british sugar corporation ltd, access roads to power station, scawby", "county": "humberside", "region": "yorkshire and humber", "country": "england", "postcode": "dn20 9lt", "longitude": -0.5096090564756909, "latitude": 53.54232796852933, "planning_authority": "north lincolnshire", "date_permission_granted": "2011-10-18", "date_under_construction": "2014-06-19", "date_operational": "2016-02-23", "source": "gov_uk", "location": "brigg renewable energy plant", "ecr_project_id": "npg23-001416"}, {"rowid": 51, "repd_project_id": "repd_project_127", "operator": "tilbury green power", "site_name": "tilbury green power", "technology_type": "biomass (dedicated)", "installed_capacity": 43.0, "development_status": "operational", "address": "tilbury docks, essex", "county": "essex", "region": "eastern", "country": "england", "postcode": "rm18 7nu", "longitude": 0.3496766121735426, "latitude": 51.46040291608526, "planning_authority": "thurrock", "date_permission_granted": "2009-08-27", "date_under_construction": "2015-04-15", "date_operational": "2017-10-26", "source": "gov_uk", "location": "tilbury green power", "ecr_project_id": "ukpn_epn_ecr_project_527"}, {"rowid": 52, "repd_project_id": "repd_project_130", "operator": "rwe", "site_name": "markinch biomass chp plant", "technology_type": "biomass (dedicated)", "installed_capacity": 65.0, "development_status": "operational", "address": "markinch, fife", "county": "fife", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.162254966067163, "latitude": 56.20118041065018, "planning_authority": "scottish government (s36)", "date_permission_granted": "2008-07-01", "date_under_construction": "2009-06-01", "date_operational": "2014-02-18", "source": "gov_uk", "location": "markinch biomass chp plant", "ecr_project_id": "0"}, {"rowid": 53, "repd_project_id": "repd_project_136", "operator": "greencoat capital", "site_name": "templeborough biomass power plant- rotherham", "technology_type": "biomass (dedicated)", "installed_capacity": 42.0, "development_status": "operational", "address": "former firth rixson ickles works, sheffield road templeborough, rotherham,", "county": "south yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "s60 1dp", "longitude": -1.3733703195069906, "latitude": 53.422585382768716, "planning_authority": "rotherham", "date_permission_granted": "2010-11-09", "date_under_construction": "2015-11-26", "date_operational": "2019-02-28", "source": "gov_uk", "location": "templeborough biomass power plant  rotherham", "ecr_project_id": "npg23-001707"}, {"rowid": 54, "repd_project_id": "repd_project_141", "operator": "e.on uk", "site_name": "blackburn meadows biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 30.0, "development_status": "operational", "address": "blackburn meadows in sheffield,", "county": "south yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -1.398459766860171, "latitude": 53.420134575016604, "planning_authority": "sheffield", "date_permission_granted": "2008-07-15", "date_under_construction": "2011-11-01", "date_operational": "2014-07-07", "source": "gov_uk", "location": "blackburn meadows biomass plant", "ecr_project_id": "0"}, {"rowid": 55, "repd_project_id": "repd_project_145", "operator": "charlesfield first llp & biogas power", "site_name": "charlesfield biomass chp plant", "technology_type": "advanced conversion technologies", "installed_capacity": 10.0, "development_status": "operational", "address": "land east of g a white motors, charlesfield industrial estate, st boswells", "county": "borders", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -2.6532891269437697, "latitude": 55.56049021716062, "planning_authority": "scottish borders", "date_permission_granted": "2009-11-26", "date_under_construction": "2015-05-01", "date_operational": "2015-06-30", "source": "gov_uk", "location": "charlesfield biomass chp plant", "ecr_project_id": "0"}, {"rowid": 56, "repd_project_id": "repd_project_146", "operator": "diageo", "site_name": "diageo biomass energy project", "technology_type": "biomass (dedicated)", "installed_capacity": 5.5, "development_status": "operational", "address": "cameronbridge distillery, cameron bridge, leven, fife", "county": "fife", "region": "scotland", "country": "scotland", "postcode": "ky8 5rl", "longitude": -3.0558964353769498, "latitude": 56.189699236859994, "planning_authority": "fife", "date_permission_granted": "2008-11-04", "date_under_construction": "2009-08-01", "date_operational": "2013-05-08", "source": "gov_uk", "location": "diageo biomass energy project", "ecr_project_id": "0"}, {"rowid": 57, "repd_project_id": "repd_project_147", "operator": "burmeister & wain scandinavian contractor (bwsc)", "site_name": "discovery park", "technology_type": "biomass (dedicated)", "installed_capacity": 16.0, "development_status": "operational", "address": "ramsgate road, sandwich,", "county": "kent", "region": "south east", "country": "england", "postcode": "ct13 9nd", "longitude": 1.345665608536484, "latitude": 51.283908762896736, "planning_authority": "dover", "date_permission_granted": "2013-10-18", "date_under_construction": "2016-06-23", "date_operational": "2018-09-28", "source": "gov_uk", "location": "discovery park", "ecr_project_id": "0"}, {"rowid": 58, "repd_project_id": "repd_project_148", "operator": "drax power", "site_name": "drax biomass power station - unit 1", "technology_type": "biomass (co-firing)", "installed_capacity": 645.0, "development_status": "operational", "address": "near selby in north yorkshire", "county": "north yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -0.9910967854169027, "latitude": 53.735588909884264, "planning_authority": "north yorkshire", "date_permission_granted": "0", "date_under_construction": "2013-04-01", "date_operational": "2013-07-30", "source": "gov_uk", "location": "drax biomass power station   unit", "ecr_project_id": "0"}, {"rowid": 59, "repd_project_id": "repd_project_149", "operator": "drax power", "site_name": "drax biomass power station - unit 3", "technology_type": "biomass (dedicated)", "installed_capacity": 645.0, "development_status": "operational", "address": "near selby in north yorkshire", "county": "north yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -0.9910967854169027, "latitude": 53.735588909884264, "planning_authority": "north yorkshire", "date_permission_granted": "0", "date_under_construction": "2017-04-01", "date_operational": "2017-07-20", "source": "gov_uk", "location": "drax biomass power station   unit", "ecr_project_id": "0"}, {"rowid": 60, "repd_project_id": "repd_project_152", "operator": "sunrise renewables", "site_name": "king george dock", "technology_type": "biomass (dedicated)", "installed_capacity": 9.0, "development_status": "operational", "address": "kingston upon hull", "county": "humberside", "region": "yorkshire and humber", "country": "england", "postcode": "hu9 5pr", "longitude": -0.28346980747192313, "latitude": 53.742437922321024, "planning_authority": "kingston upon hull, city of", "date_permission_granted": "2013-02-05", "date_under_construction": "2016-04-15", "date_operational": "2018-04-15", "source": "gov_uk", "location": "king george dock", "ecr_project_id": "0"}, {"rowid": 61, "repd_project_id": "repd_project_155", "operator": "northampton general hospital", "site_name": "northampton general hospital", "technology_type": "biomass (dedicated)", "installed_capacity": 1.9, "development_status": "operational", "address": "northampton general hospital trust, cliftonville, northampton,", "county": "northamptonshire", "region": "east midlands", "country": "england", "postcode": "nn1 5bd", "longitude": -0.8819294672480938, "latitude": 52.23648503453063, "planning_authority": "west northamptonshire", "date_permission_granted": "2014-06-30", "date_under_construction": "2015-03-01", "date_operational": "2016-03-01", "source": "gov_uk", "location": "northampton general hospital", "ecr_project_id": "0"}, {"rowid": 62, "repd_project_id": "repd_project_158", "operator": "burmeister & wain scandinavian contractor a/s (bwsc)", "site_name": "snetterton biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 44.2, "development_status": "operational", "address": "snetterton heath, near the a11 in snetterton", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "nr16 2ju", "longitude": 0.954434485788937, "latitude": 52.47914821421846, "planning_authority": "breckland", "date_permission_granted": "2012-07-18", "date_under_construction": "2015-01-20", "date_operational": "2016-12-13", "source": "gov_uk", "location": "snetterton biomass plant", "ecr_project_id": "0"}, {"rowid": 63, "repd_project_id": "repd_project_159", "operator": "speyside renewable energy partnership", "site_name": "speyside biomass chp plant", "technology_type": "biomass (dedicated)", "installed_capacity": 12.5, "development_status": "operational", "address": "craigellachie wood, craigellachie, aberlour,", "county": "grampian", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.208854608981206, "latitude": 57.49468063658124, "planning_authority": "moray", "date_permission_granted": "2013-03-08", "date_under_construction": "2014-11-26", "date_operational": "2016-06-24", "source": "gov_uk", "location": "speyside biomass chp plant", "ecr_project_id": "0"}, {"rowid": 64, "repd_project_id": "repd_project_163", "operator": "burmeister & wain scandinavian (bwsc)/ bioenergy infrastructure group", "site_name": "widnes 3mg biomass/mersey bioenergy (chp) plant", "technology_type": "biomass (dedicated)", "installed_capacity": 20.0, "development_status": "operational", "address": "stobart park/3mg multi modal gateway (formerly known as west bank industrial estate) approximately 1 kilometre (0.6 miles) west of widnes town centre", "county": "merseyside", "region": "north west", "country": "england", "postcode": "bt79 9hh", "longitude": -2.7512896562142806, "latitude": 53.35456413702029, "planning_authority": "halton", "date_permission_granted": "2013-04-04", "date_under_construction": "2015-02-01", "date_operational": "2017-02-06", "source": "gov_uk", "location": "widnes", "ecr_project_id": "0"}, {"rowid": 65, "repd_project_id": "repd_project_165", "operator": "drax power", "site_name": "drax biomass power station - unit 2", "technology_type": "biomass (dedicated)", "installed_capacity": 645.0, "development_status": "operational", "address": "near selby in north yorkshire", "county": "north yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -0.9910967854169027, "latitude": 53.735588909884264, "planning_authority": "north yorkshire", "date_permission_granted": "0", "date_under_construction": "0", "date_operational": "2014-05-30", "source": "gov_uk", "location": "drax biomass power station   unit", "ecr_project_id": "0"}, {"rowid": 66, "repd_project_id": "repd_project_169", "operator": "e.on  (formerly powergen). agent environmental planning and management", "site_name": "stevens croft", "technology_type": "biomass (dedicated)", "installed_capacity": 50.4, "development_status": "operational", "address": "4km north of lockerbie, adjacent to the a74m", "county": "dumfries and galloway", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.3808913069179294, "latitude": 55.15240118273998, "planning_authority": "dumfries and galloway", "date_permission_granted": "2005-04-01", "date_under_construction": "2006-06-01", "date_operational": "2007-12-15", "source": "gov_uk", "location": "stevens croft", "ecr_project_id": "0"}, {"rowid": 67, "repd_project_id": "repd_project_177", "operator": "unknown", "site_name": "macphie of glenbervie", "technology_type": "biomass (dedicated)", "installed_capacity": 1.2, "development_status": "operational", "address": "macphie of glenbervie ltd, glenbervie, stonehaven", "county": "grampian", "region": "scotland", "country": "scotland", "postcode": "ab39 3yg", "longitude": -2.3875809345163814, "latitude": 56.91521885681524, "planning_authority": "aberdeenshire", "date_permission_granted": "2007-09-27", "date_under_construction": "0", "date_operational": "2008-09-01", "source": "gov_uk", "location": "macphie of glenbervie", "ecr_project_id": "0"}, {"rowid": 68, "repd_project_id": "repd_project_178", "operator": "glenmont partners", "site_name": "sleaford renewable energy plant", "technology_type": "biomass (dedicated)", "installed_capacity": 40.0, "development_status": "operational", "address": "boston road, north kesteven, sleaford", "county": "lincolnshire", "region": "east midlands", "country": "england", "postcode": "0", "longitude": -0.3827234368322801, "latitude": 52.99900964629439, "planning_authority": "north kesteven", "date_permission_granted": "2008-11-04", "date_under_construction": "2012-05-10", "date_operational": "2014-11-28", "source": "gov_uk", "location": "sleaford renewable energy plant", "ecr_project_id": "nged_emids_ecr_project_833"}, {"rowid": 69, "repd_project_id": "repd_project_179", "operator": "holsworthy biogas company ( north tamar business network)", "site_name": "north tamar environ project - holsworthy  (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.4, "development_status": "operational", "address": "land north-east of higher manworth holsworthy\r, devon", "county": "devon", "region": "south west", "country": "england", "postcode": "0", "longitude": -4.352036311667947, "latitude": 50.82800336466742, "planning_authority": "torridge", "date_permission_granted": "1999-05-14", "date_under_construction": "0", "date_operational": "2002-07-18", "source": "gov_uk", "location": "north tamar environ project   holsworthy  farm ad", "ecr_project_id": "nged_swest_ecr_project_4220"}, {"rowid": 70, "repd_project_id": "repd_project_180", "operator": "scottish water solutions", "site_name": "deerdykes composting and organics recycling facility (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.0, "development_status": "operational", "address": "dunswood road, cumbermould, glasgow, strathclyde", "county": "strathclyde", "region": "scotland", "country": "scotland", "postcode": "g67 3en", "longitude": -3.9575231364365444, "latitude": 55.970409551538346, "planning_authority": "north lanarkshire", "date_permission_granted": "0", "date_under_construction": "2009-08-01", "date_operational": "2010-09-28", "source": "gov_uk", "location": "deerdykes composting and organics recycling facility waste ad", "ecr_project_id": "0"}, {"rowid": 71, "repd_project_id": "repd_project_181", "operator": "shanks group", "site_name": "cumbernauld bioplant  (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.4, "development_status": "operational", "address": "shanks landfill site meikle drumgray road greengairs airdrie lanarkshire", "county": "strathclyde", "region": "scotland", "country": "scotland", "postcode": "0", "longitude": -3.9575231364365444, "latitude": 55.970409551538346, "planning_authority": "north lanarkshire", "date_permission_granted": "2004-12-20", "date_under_construction": "2010-09-01", "date_operational": "2011-10-05", "source": "gov_uk", "location": "cumbernauld bioplant  waste ad", "ecr_project_id": "0"}, {"rowid": 72, "repd_project_id": "repd_project_182", "operator": "farmgen", "site_name": "carr farm (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.0, "development_status": "operational", "address": "carr farm cottage, lodge lane, warton, lytham st annes,", "county": "lancashire", "region": "north west", "country": "england", "postcode": "fy8 5rp", "longitude": -2.9287666876104437, "latitude": 53.7485466153514, "planning_authority": "fylde", "date_permission_granted": "2009-05-06", "date_under_construction": "2009-06-01", "date_operational": "2010-01-01", "source": "gov_uk", "location": "carr farm farm ad", "ecr_project_id": "enw__ecr_project_487"}, {"rowid": 73, "repd_project_id": "repd_project_183", "operator": "severn trent water", "site_name": "stoke bardolph energy crop (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "stoke bardolf,", "county": "nottinghamshire", "region": "east midlands", "country": "england", "postcode": "0", "longitude": -1.039584230297768, "latitude": 52.97593249262566, "planning_authority": "gedling", "date_permission_granted": "2009-03-11", "date_under_construction": "0", "date_operational": "2010-07-10", "source": "gov_uk", "location": "stoke bardolph energy crop farm ad", "ecr_project_id": "0"}, {"rowid": 74, "repd_project_id": "repd_project_184", "operator": "bv dairy", "site_name": "bv dairy  (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.5, "development_status": "operational", "address": "wincombe lane, shaftesbury, dorset", "county": "dorset", "region": "south west", "country": "england", "postcode": "0", "longitude": -2.1827592610816344, "latitude": 51.011187913466436, "planning_authority": "dorset", "date_permission_granted": "2009-07-28", "date_under_construction": "0", "date_operational": "2011-01-05", "source": "gov_uk", "location": "bv dairy  farm ad", "ecr_project_id": "0"}, {"rowid": 75, "repd_project_id": "repd_project_186", "operator": "viridor", "site_name": "south manchester resource recovery centre (ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "longley lane, sharston", "county": "greater manchester", "region": "north west", "country": "england", "postcode": "0", "longitude": -2.2460991526264804, "latitude": 53.39435635002784, "planning_authority": "manchester", "date_permission_granted": "2007-12-20", "date_under_construction": "2010-11-01", "date_operational": "2012-01-01", "source": "gov_uk", "location": "south manchester resource recovery centre ad", "ecr_project_id": "0"}, {"rowid": 76, "repd_project_id": "repd_project_187", "operator": "viridor", "site_name": "reliance street mechanical biological treatment facility (mbt)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "reliance street, newton heath, manchester", "county": "greater manchester", "region": "north west", "country": "england", "postcode": "m40 3ez", "longitude": -2.1806543730424397, "latitude": 53.504133082978434, "planning_authority": "manchester", "date_permission_granted": "2008-10-09", "date_under_construction": "2010-11-01", "date_operational": "2011-04-07", "source": "gov_uk", "location": "reliance street mechanical biological treatment facility mbt", "ecr_project_id": "enw__ecr_project_477"}, {"rowid": 77, "repd_project_id": "repd_project_189", "operator": "local generation", "site_name": "fenmarc fenland ad plant (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.5, "development_status": "operational", "address": "wisbech road, march,", "county": "cambridgeshire", "region": "eastern", "country": "england", "postcode": "pe15 0ba", "longitude": 0.06207352506035206, "latitude": 52.56804576203563, "planning_authority": "fenland", "date_permission_granted": "2009-06-22", "date_under_construction": "2011-12-01", "date_operational": "2012-11-01", "source": "gov_uk", "location": "fenmarc fenland ad plant waste ad", "ecr_project_id": "ukpn_epn_ecr_project_413"}, {"rowid": 78, "repd_project_id": "repd_project_191", "operator": "staples brothers", "site_name": "marsh farm  (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.4, "development_status": "operational", "address": "sea lane, wrangle, boston,", "county": "lincolnshire", "region": "east midlands", "country": "england", "postcode": "pe22 9he", "longitude": 0.15685440627095057, "latitude": 53.03360131224837, "planning_authority": "boston", "date_permission_granted": "2009-08-03", "date_under_construction": "0", "date_operational": "2011-02-24", "source": "gov_uk", "location": "marsh farm  farm ad", "ecr_project_id": "nged_emids_ecr_project_817"}, {"rowid": 79, "repd_project_id": "repd_project_192", "operator": "global renewables lancashire", "site_name": "thornton waste recovery park (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.9, "development_status": "operational", "address": "fleetwood road north, thornton", "county": "lancashire", "region": "north west", "country": "england", "postcode": "0", "longitude": -3.015064435908524, "latitude": 53.894779140068, "planning_authority": "wyre", "date_permission_granted": "2010-01-28", "date_under_construction": "0", "date_operational": "2010-05-01", "source": "gov_uk", "location": "thornton waste recovery park waste ad", "ecr_project_id": "0"}, {"rowid": 80, "repd_project_id": "repd_project_193", "operator": "global renewables lancashire", "site_name": "farington waste recovery park (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.9, "development_status": "operational", "address": "0", "county": "lancashire", "region": "north west", "country": "england", "postcode": "0", "longitude": -2.737306842879087, "latitude": 53.70300377551609, "planning_authority": "south ribble", "date_permission_granted": "2006-11-22", "date_under_construction": "0", "date_operational": "2010-09-01", "source": "gov_uk", "location": "farington waste recovery park waste ad", "ecr_project_id": "0"}, {"rowid": 81, "repd_project_id": "repd_project_195", "operator": "fernbrook bio limited", "site_name": "fernbrook ad plant (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.5, "development_status": "operational", "address": "rothwell lodge farm, rothwell, kettering", "county": "northamptonshire", "region": "east midlands", "country": "england", "postcode": "nn16 8xf", "longitude": -0.7662472003212395, "latitude": 52.41192855918778, "planning_authority": "north northamptonshire", "date_permission_granted": "2009-10-22", "date_under_construction": "0", "date_operational": "2010-09-01", "source": "gov_uk", "location": "fernbrook ad plant waste ad", "ecr_project_id": "nged_wmids_ecr_project_2828"}, {"rowid": 82, "repd_project_id": "repd_project_196", "operator": "barfoots of botley", "site_name": "sefter farm ad plant (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.0, "development_status": "operational", "address": "sefter farm pagham road pagham", "county": "west sussex", "region": "south east", "country": "england", "postcode": "0", "longitude": -0.737299612966745, "latitude": 50.78897055009258, "planning_authority": "arun", "date_permission_granted": "2008-10-02", "date_under_construction": "0", "date_operational": "2010-06-01", "source": "gov_uk", "location": "sefter farm ad plant farm ad", "ecr_project_id": "0"}, {"rowid": 83, "repd_project_id": "repd_project_197", "operator": "private developer", "site_name": "brookfield farm ad plant (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.3, "development_status": "operational", "address": "lower reule, church eaton, stafford", "county": "staffordshire", "region": "west midlands", "country": "england", "postcode": "0", "longitude": -2.231175020218565, "latitude": 52.77522003388883, "planning_authority": "stafford", "date_permission_granted": "2009-05-01", "date_under_construction": "0", "date_operational": "2010-05-01", "source": "gov_uk", "location": "brookfield farm ad plant farm ad", "ecr_project_id": "0"}, {"rowid": 84, "repd_project_id": "repd_project_198", "operator": "severn trent (formerly agrivert)", "site_name": "cassington ad (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.1, "development_status": "operational", "address": "worton farm, worton, witney, oxon", "county": "oxfordshire", "region": "south east", "country": "england", "postcode": "ox29 4fl", "longitude": -1.3302880915627093, "latitude": 51.79956330057421, "planning_authority": "west oxfordshire", "date_permission_granted": "2008-08-29", "date_under_construction": "0", "date_operational": "2010-09-01", "source": "gov_uk", "location": "cassington ad waste ad", "ecr_project_id": "0"}, {"rowid": 85, "repd_project_id": "repd_project_199", "operator": "blakiston houston estate company", "site_name": "bh energy - biogas (ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.1, "development_status": "operational", "address": "99 ballymiscaw road, dundonald, belfast", "county": "co. down", "region": "northern ireland", "country": "northern ireland", "postcode": "bt16 1tx", "longitude": -5.788908710141073, "latitude": 54.619292139132035, "planning_authority": "lisburn and castlereagh", "date_permission_granted": "2010-11-01", "date_under_construction": "0", "date_operational": "2012-04-04", "source": "gov_uk", "location": "bh energy   biogas ad", "ecr_project_id": "0"}, {"rowid": 86, "repd_project_id": "repd_project_200", "operator": "bio capital limited", "site_name": "energen biogas cumbernauld", "technology_type": "anaerobic digestion", "installed_capacity": 2.4, "development_status": "operational", "address": "dunnswood road, wardpark south industrial estate, cumbernauld, glasgow", "county": "strathclyde", "region": "scotland", "country": "scotland", "postcode": "g67 3en", "longitude": -3.9580472528411432, "latitude": 55.96968228931619, "planning_authority": "north lanarkshire", "date_permission_granted": "2008-11-05", "date_under_construction": "0", "date_operational": "2011-06-22", "source": "gov_uk", "location": "energen biogas cumbernauld", "ecr_project_id": "0"}, {"rowid": 87, "repd_project_id": "repd_project_201", "operator": "geneco", "site_name": "bristol stw (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 10.0, "development_status": "operational", "address": "kings weston lane, avonmouth, bristol", "county": "avon", "region": "south west", "country": "england", "postcode": "bs11 0ys", "longitude": -2.6700284825690157, "latitude": 51.512778923491624, "planning_authority": "bristol, city of", "date_permission_granted": "2010-12-14", "date_under_construction": "0", "date_operational": "2012-12-04", "source": "gov_uk", "location": "bristol  waste ad", "ecr_project_id": "0"}, {"rowid": 88, "repd_project_id": "repd_project_202", "operator": "projen", "site_name": "a c shropshire (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.5, "development_status": "operational", "address": "green lodge farm, forest road, huncote, leicester", "county": "leicestershire", "region": "east midlands", "country": "england", "postcode": "le9 3le", "longitude": -1.2374993649958492, "latitude": 52.58601717051009, "planning_authority": "blaby", "date_permission_granted": "2010-01-11", "date_under_construction": "0", "date_operational": "2013-05-14", "source": "gov_uk", "location": "a c shropshire farm ad", "ecr_project_id": "0"}, {"rowid": 89, "repd_project_id": "repd_project_204", "operator": "biogas nord", "site_name": "lowbrook farm anaerobic digester (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.3, "development_status": "operational", "address": "lowbrook farm, belchalwell, okeford fitzpaine, blandford forum", "county": "dorset", "region": "south west", "country": "england", "postcode": "0", "longitude": -2.302219212711289, "latitude": 50.883248441409705, "planning_authority": "dorset", "date_permission_granted": "2006-06-06", "date_under_construction": "0", "date_operational": "2006-06-26", "source": "gov_uk", "location": "lowbrook farm anaerobic digester farm ad", "ecr_project_id": "0"}, {"rowid": 90, "repd_project_id": "repd_project_206", "operator": "geo e gittus and son", "site_name": "symonds farm power ltd (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.4, "development_status": "operational", "address": "orchard piggeries symonds farm newmarket road risby", "county": "suffolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 0.637138275097411, "latitude": 52.25718819420315, "planning_authority": "west suffolk", "date_permission_granted": "2009-09-07", "date_under_construction": "0", "date_operational": "2012-03-01", "source": "gov_uk", "location": "symonds farm power ltd farm ad", "ecr_project_id": "0"}, {"rowid": 91, "repd_project_id": "repd_project_207", "operator": "hallwick energy", "site_name": "buttermilk farm", "technology_type": "anaerobic digestion", "installed_capacity": 1.1, "development_status": "operational", "address": "baldock road, buntingford", "county": "hertfordshire", "region": "eastern", "country": "england", "postcode": "sg9 9rh", "longitude": -0.048728326512183825, "latitude": 51.94685097609658, "planning_authority": "east hertfordshire", "date_permission_granted": "2011-01-12", "date_under_construction": "2011-03-30", "date_operational": "2012-05-01", "source": "gov_uk", "location": "buttermilk farm", "ecr_project_id": "ukpn_epn_ecr_project_80"}, {"rowid": 92, "repd_project_id": "repd_project_208", "operator": "private developer", "site_name": "spring farm (biomass)", "technology_type": "anaerobic digestion", "installed_capacity": 1.0, "development_status": "operational", "address": "fir covert road,taverham", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 1.1950133123477629, "latitude": 52.70134214723415, "planning_authority": "broadland", "date_permission_granted": "2009-12-15", "date_under_construction": "0", "date_operational": "2011-08-01", "source": "gov_uk", "location": "spring farm biomass", "ecr_project_id": "ukpn_epn_ecr_project_887"}, {"rowid": 93, "repd_project_id": "repd_project_209", "operator": "hallwick energy", "site_name": "trinity hall farm", "technology_type": "anaerobic digestion", "installed_capacity": 1.1, "development_status": "operational", "address": "watling street, hockliffe, leighton buzzard", "county": "bedfordshire", "region": "eastern", "country": "england", "postcode": "lu7 9py", "longitude": -0.5655649608903152, "latitude": 51.918829185552035, "planning_authority": "central bedfordshire", "date_permission_granted": "2011-03-02", "date_under_construction": "0", "date_operational": "2012-11-01", "source": "gov_uk", "location": "trinity hall farm", "ecr_project_id": "ukpn_epn_ecr_project_885"}, {"rowid": 94, "repd_project_id": "repd_project_211", "operator": "prosper demulder / refood", "site_name": "prosper demulder limited anaerobic digestion plant (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "ings road, bentley, doncaster,", "county": "south yorkshire", "region": "yorkshire and humber", "country": "england", "postcode": "dn5 9sw", "longitude": -1.137433551546547, "latitude": 53.53691685201669, "planning_authority": "doncaster", "date_permission_granted": "2009-02-17", "date_under_construction": "2011-04-01", "date_operational": "2011-09-09", "source": "gov_uk", "location": "prosper demulder limited anaerobic digestion plant waste ad", "ecr_project_id": "0"}, {"rowid": 95, "repd_project_id": "repd_project_213", "operator": "gwe biogas", "site_name": "sandhill anaerobic digestion plant (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "land north east of battleburn cottages garton road kirkburn", "county": "humberside", "region": "yorkshire and humber", "country": "england", "postcode": "0", "longitude": -0.49851001920892735, "latitude": 53.9919771681073, "planning_authority": "east riding of yorkshire", "date_permission_granted": "2009-05-06", "date_under_construction": "0", "date_operational": "2011-01-01", "source": "gov_uk", "location": "sandhill anaerobic digestion plant waste ad", "ecr_project_id": "npg23-001096"}, {"rowid": 96, "repd_project_id": "repd_project_215", "operator": "private developer", "site_name": "abbots moor farm anaerobic digester (farm ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.0, "development_status": "operational", "address": "haughton, west felton,", "county": "shropshire", "region": "west midlands", "country": "england", "postcode": "0", "longitude": -2.930006539458361, "latitude": 52.83896140674539, "planning_authority": "shropshire", "date_permission_granted": "2011-09-26", "date_under_construction": "0", "date_operational": "2012-11-30", "source": "gov_uk", "location": "abbots moor farm anaerobic digester farm ad", "ecr_project_id": "0"}, {"rowid": 97, "repd_project_id": "repd_project_217", "operator": "biffa", "site_name": "poplars anaerobic digestion facility (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 6.0, "development_status": "operational", "address": "poplars landfill site, lichfield road, cannock", "county": "staffordshire", "region": "west midlands", "country": "england", "postcode": "0", "longitude": -2.009986604060092, "latitude": 52.68408424357176, "planning_authority": "cannock chase", "date_permission_granted": "2010-01-15", "date_under_construction": "2011-06-01", "date_operational": "2011-07-31", "source": "gov_uk", "location": "poplars anaerobic digestion facility waste ad", "ecr_project_id": "0"}, {"rowid": 98, "repd_project_id": "repd_project_219", "operator": "material change", "site_name": "reepham road (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 1.5, "development_status": "operational", "address": "near felthorpe,", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "0", "longitude": 1.2028064607458595, "latitude": 52.700816922143886, "planning_authority": "broadland", "date_permission_granted": "2011-05-25", "date_under_construction": "2011-07-31", "date_operational": "2012-04-30", "source": "gov_uk", "location": "reepham road waste ad", "ecr_project_id": "0"}, {"rowid": 99, "repd_project_id": "repd_project_223", "operator": "severn trent water", "site_name": "coleshill stw (waste ad)", "technology_type": "anaerobic digestion", "installed_capacity": 2.4, "development_status": "operational", "address": "coleshill stw, lichfield road, coleshill,", "county": "warwickshire", "region": "west midlands", "country": "england", "postcode": "b46 1da", "longitude": -1.711638864112474, "latitude": 52.51898750456639, "planning_authority": "north warwickshire", "date_permission_granted": "2013-11-13", "date_under_construction": "2014-03-03", "date_operational": "2015-04-15", "source": "gov_uk", "location": "coleshill  waste ad", "ecr_project_id": "0"}, {"rowid": 100, "repd_project_id": "repd_project_224", "operator": "bio dynamic", "site_name": "colwick industrial estate (farm and food waste)", "technology_type": "anaerobic digestion", "installed_capacity": 2.0, "development_status": "operational", "address": "eurobait company road, no 4 colwick,", "county": "nottinghamshire", "region": "east midlands", "country": "england", "postcode": "ng4 2jt", "longitude": -1.0578048392136887, "latitude": 52.952327863700674, "planning_authority": "gedling", "date_permission_granted": "2013-09-02", "date_under_construction": "2014-03-01", "date_operational": "2014-09-30", "source": "gov_uk", "location": "colwick industrial estate farm and food waste", "ecr_project_id": "nged_emids_ecr_project_982"}], "truncated": false}