{"ok": true, "database": "primary", "table": "repd", "rows": [{"rowid": 62, "repd_project_id": "repd_project_158", "operator": "burmeister & wain scandinavian contractor a/s (bwsc)", "site_name": "snetterton biomass plant", "technology_type": "biomass (dedicated)", "installed_capacity": 44.2, "development_status": "operational", "address": "snetterton heath, near the a11 in snetterton", "county": "norfolk", "region": "eastern", "country": "england", "postcode": "nr16 2ju", "longitude": 0.954434485788937, "latitude": 52.47914821421846, "planning_authority": "breckland", "date_permission_granted": "2012-07-18", "date_under_construction": "2015-01-20", "date_operational": "2016-12-13", "source": "gov_uk", "location": "snetterton biomass plant", "ecr_project_id": "0"}], "primary_keys": ["rowid"], "primary_key_values": ["62"], "query_ms": 23.902634158730507, "truncated": false}