rowid,repd_project_id,operator,site_name,technology_type,installed_capacity,development_status,address,county,region,country,postcode,longitude,latitude,planning_authority,date_permission_granted,date_under_construction,date_operational,source,location 1,repd_project_0,rwe npower,aberthaw power station biomass,biomass (co-firing),35.0,decommissioned,"aberthaw power station, the leys, aberthaw barry",south glamorgan,wales,wales,cf62 4zw,-3.4066095120083357,51.38747061309072,vale of glamorgan,2004-09-03,2006-05-01,2007-05-01,gov_uk,aberthaw power station biomass 2,repd_project_1,orsted (formerly dong energy) / peel energy,hunterston - cofiring,biomass (co-firing),170.0,application withdrawn,"hunterston, fairlie, west kilbride, ayrshire",strathclyde,scotland,scotland,0,-4.8885740959992665,55.735806695922626,scottish government (s36),0,0,0,gov_uk,hunterston cofiring 3,repd_project_2,scottish and southern energy (sse),ferrybridge multifuel 2 (fm2),efw incineration,70.0,operational,0,west yorkshire,yorkshire and humber,england,0,-1.2818852350690881,53.71641723929932,the planning inspectorate - national infrastructure,2015-10-28,2016-09-01,2019-12-20,gov_uk,ferrybridge multifuel 4,repd_project_3,energy power resources,thetford biomass power station,biomass (dedicated),38.5,operational,"thetford power station , marley building materials site , two mile bottom, mundford road, thetford , norfolk",norfolk,eastern,england,0,0.7252726989252509,52.44862816984887,breckland,1995-05-05,0,1998-10-02,gov_uk,thetford biomass power station 5,repd_project_4,agrigen,nunn mills road biomass plant,biomass (dedicated),8.8,application refused,"nunn mills road , northampton , northamptonshire",northamptonshire,east midlands,england,0,-0.8813407286354008,52.230194915074584,west northamptonshire,0,0,0,gov_uk,nunn mills road biomass plant 6,repd_project_5,incetec / border biofuels,kingmoor marshalling yard,biomass (dedicated),20.0,abandoned,"kingmoor marshalling yard, carlisle, cumbria",cumbria,north west,england,0,-2.981517724259345,54.92891236375617,cumberland,2000-03-16,0,0,gov_uk,kingmoor marshalling yard 7,repd_project_6,novera,north wiltshire biomass power plant,biomass (dedicated),5.5,application refused,"north wiltshire biomass power plant, kingshill farm, cricklade,",wiltshire,south west,england,0,-1.83524848949045,51.63119651564309,wiltshire,0,0,0,gov_uk,north wiltshire biomass power plant 8,repd_project_7,private developer,0,biomass (dedicated),15.0,application withdrawn,"land adjacent to bsw sawmills, newbridge on wye",powys,wales,wales,0,-3.4292721757404365,52.19356939263252,powys,0,0,0,gov_uk,0 9,repd_project_8,agricultural energy company limited,poole biomass plant,biomass (dedicated),10.9,application withdrawn,"poole biomass power plant, near wellington , adjacent to brickworks and waste disposal site , near wellington , somerset",somerset,south west,england,0,-3.213853762703558,50.989285914191385,somerset,0,0,0,gov_uk,poole biomass plant 10,repd_project_9,yorkshire environmental,eggborough biomass power station,advanced conversion technologies,10.6,abandoned,eggborough biomass power station eggborough near selby north yorkshire,north yorkshire,yorkshire and humber,england,0,-1.1348973620437537,53.709298385804765,north yorkshire,1997-01-15,0,0,gov_uk,eggborough biomass power station 11,repd_project_10,eastman peboc factory,eastman peboc factory,biomass (dedicated),31.0,appeal refused,0,gwynedd,wales,wales,0,-4.351461751140031,53.26345360861088,isle of anglesey,0,0,0,gov_uk,eastman peboc factory 12,repd_project_11,ahs energy,ahs energy (combustion),biomass (dedicated),4.5,application refused,"ahs energy, coppards lane, northiam,",east sussex,south east,england,tn31 6qp,0.6151434282005551,51.003843972873476,rother,0,0,0,gov_uk,ahs energy combustion 13,repd_project_12,northern energy developments,forestry commission depot,biomass (dedicated),5.0,application refused,"invergarry,",highland,scotland,scotland,ph35 4hg,-4.817385652819883,57.068853172005475,highland,0,0,0,gov_uk,forestry commission depot 14,repd_project_13,dalkia,chilton energy plant,biomass (dedicated),18.0,operational,"chilton industrial estate, chilton, ferryhill,",county durham,north east,england,0,-1.5666318523581944,54.66802704015,county durham,2009-11-24,2010-03-01,2012-03-12,gov_uk,chilton energy plant 15,repd_project_14,bronzeoak thermal processing,bronzeoak thermal,biomass (dedicated),12.7,abandoned,"btpl, acorn industrial park, dimmer lane, castle cary,",somerset,south west,england,ba7 7nr,-2.546429116857641,51.08518258629696,somerset,2002-08-22,0,0,gov_uk,bronzeoak thermal 16,repd_project_15,land energy limited,chilton bros biomass plant,biomass (dedicated),2.5,application withdrawn,19 ladywell avenue girvan,strathclyde,scotland,scotland,ka26 9pf,-4.8355445963172015,55.262926297123094,south ayrshire,0,0,0,gov_uk,chilton bros biomass plant 17,repd_project_16,double h nurseries,double h nurseries biomass plant,biomass (dedicated),1.5,operational,"double h nurseries, gore road, new milton",hampshire,south east,england,bh25 5nq,-1.6781191025064066,50.7507820194218,new forest,2012-05-29,0,2012-12-15,gov_uk,double h nurseries biomass plant 18,repd_project_17,react energy (kedco),newry biomass phase 1 (gasification),advanced conversion technologies,2.0,operational,newry,co. down,northern ireland,northern ireland,0,-6.336669144281395,54.2175068933632,"newry, mourne and down",0,0,2012-06-27,gov_uk,newry biomass phase 19,repd_project_18,balfour beatty,beckton stw biodiesel power plant,biomass (dedicated),8.0,operational,beckton sewage treatment works jenkins lane east ham london,london,london,england,ig11 0ad,0.09346150714755841,51.51777682481655,newham,0,0,2010-12-01,gov_uk,beckton biodiesel power plant 20,repd_project_19,living power (reg bio-power),buslingthorpe power station (leeds north),biomass (dedicated),2.0,operational,"penraevon industrial estate, buslingthorpe green, leeds",west yorkshire,yorkshire and humber,england,ls7 2hg,-1.5426149979781192,53.814326540186414,leeds,2010-12-30,0,2011-10-14,gov_uk,buslingthorpe power station leeds north 21,repd_project_20,surrey county council,redhill road biomass power plant,biomass (dedicated),2.5,application refused,"the depot, 46 redhill road, cobham",surrey,south east,england,kt11 1eq,-0.4499084332238287,51.33118194560277,elmbridge,0,0,0,gov_uk,redhill road biomass power plant 22,repd_project_21,balcas,invergordon pellet mill,biomass (dedicated),5.0,operational,"invergordon, ross-shire",highland,scotland,scotland,0,-4.159926948232918,57.70539165399964,highland,2007-04-16,0,2009-11-01,gov_uk,invergordon pellet mill 23,repd_project_22,green renewable energy company,clean renewable plant at old llynfi power station,biomass (dedicated),10.0,abandoned,"old llynfi power station, aberkenfig, bridgend",mid glamorgan,wales,wales,0,-3.611633564329074,51.56989077491022,bridgend,2006-02-16,0,0,gov_uk,clean renewable plant at old llynfi power station 24,repd_project_23,balcas timber,balcas timber biomass chp plant,biomass (dedicated),2.5,operational,"balcas timber ltd, laragh, enniskillen, co. fermanagh",co. fermanagh,northern ireland,northern ireland,bt94 2fq,-7.66394293956149,54.30732796895875,fermanagh and omagh,2004-06-01,0,2005-11-14,gov_uk,balcas timber biomass chp plant 25,repd_project_24,caledonian paper,caledonian papermill,biomass (dedicated),26.0,operational,"meadowhead road, shewalton, irvine",strathclyde,scotland,scotland,ka11 5at,-4.639538748255496,55.57964477561989,north ayrshire,2006-07-11,0,2009-06-04,gov_uk,caledonian papermill 26,repd_project_25,uk wood recycling,wilton international,biomass (dedicated),35.2,operational,"wilton international, po box 1985, wilton, middlesbrough, cleveland",cleveland,north east,england,ts90 8ws,-1.0967260930948521,54.56735093089087,redcar and cleveland,2006-11-07,2006-11-08,2007-03-26,gov_uk,wilton international 27,repd_project_26,bioflame,south view farm,biomass (dedicated),2.0,operational,"south view farm , yatts , pickering",north yorkshire,yorkshire and humber,england,0,-0.7585731053982055,54.27032216540648,north yorkshire,2006-10-24,0,2007-10-01,gov_uk,south view farm 28,repd_project_27,g b bio,tansterne straw-burning power station,biomass (dedicated),10.0,revised,"land east of tansterne grange, tansterne lane, flinton,",humberside,yorkshire and humber,england,0,-0.14021262261241582,53.819389117501586,east riding of yorkshire,0,0,0,gov_uk,tansterne straw burning power station 29,repd_project_28,rwe innogy,stallingborough biomass power plant,biomass (dedicated),65.0,revised,"stallingborough, near the port facilities of immingham",humberside,yorkshire and humber,england,dn41 8,-0.20377460697945468,53.58676789069134,north east lincolnshire,2011-05-16,0,0,gov_uk,stallingborough biomass power plant 30,repd_project_29,norbord,cowie biomass facility,biomass (dedicated),15.0,operational,"norbord ltd, station road, cowie,",stirling,scotland,scotland,fk7 7bw,-3.863920687864198,56.076885380402956,stirling,2006-07-27,0,2008-02-01,gov_uk,cowie biomass facility 31,repd_project_30,private developer,brigg renewable energy plant,biomass (dedicated),40.0,revised,"british sugar corporation ltd, access roads to power station, scawby",humberside,yorkshire and humber,england,dn20 9lt,-0.5096090564756909,53.54232796852933,north lincolnshire,0,0,0,gov_uk,brigg renewable energy plant 32,repd_project_31,dingle holdings,kings dock biomass,biomass (dedicated),49.9,appeal refused,"kings dock , swansea",west glamorgan,wales,wales,sa1 8qt,-3.909341373859604,51.61583478003452,swansea,0,0,0,gov_uk,kings dock biomass 33,repd_project_32,tps (uk),thornton power station,biomass (dedicated),9.0,operational,wyre,lancashire,north west,england,0,-2.9975020662798593,53.88194737654642,wyre,0,0,2002-06-15,gov_uk,thornton power station 34,repd_project_33,a c shropshire ltd,green's lodge farm,anaerobic digestion,2.0,operational,"a c shropshire ltd, green's lodge farm, forest road, huncote",leicestershire,east midlands,england,le67 4uy,-1.31248912541172,52.723993966537,north west leicestershire,0,0,2013-05-14,gov_uk,green's lodge farm 35,repd_project_34,iggesund paperboard (workington),iggesund paperboard chp plant,biomass (dedicated),49.0,operational,"siddick, workington, cumbria",cumbria,north west,england,ca14 1jx,-3.5473310650198666,54.66397639977084,cumberland,2011-03-08,0,2013-02-17,gov_uk,iggesund paperboard chp plant 36,repd_project_35,biossence,cophall wood (att),biomass (dedicated),19.0,application withdrawn,"land adjoining cophall wood transfer station, cophall wood, hailsham road (a22), polegate",east sussex,south east,england,0,0.23862165410659422,50.83991429575267,wealden,0,0,0,gov_uk,cophall wood att 37,repd_project_36,ancillary components,goosey lodge industrial estate,biomass (dedicated),16.0,operational,"goosey lodge industrial estate , wymington , rushden , northamptonshire",bedfordshire,eastern,england,nn10 9lu,-0.5993551681750761,52.020712860705245,central bedfordshire,0,0,2000-12-31,gov_uk,goosey lodge industrial estate 38,repd_project_37,express power,express park,biomass (dedicated),40.0,application refused,"express park (land north of express road), bristol road, bridgwater",somerset,south west,england,0,-2.992242606554589,51.12689485676415,somerset,0,0,0,gov_uk,express park 39,repd_project_38,western skip hire,limekiln hill quarry,biomass (dedicated),1.0,abandoned,"limekiln hill quarry, mells",somerset,south west,england,0,-2.3953495897519974,51.24400614546463,somerset,2000-12-11,0,0,gov_uk,limekiln hill quarry 40,repd_project_39,energy power resources,grimethorpe biomass gasification power plant,biomass (dedicated),42.0,application withdrawn,ferrymoor,south yorkshire,yorkshire and humber,england,0,-1.4777189447798196,53.55218932048056,barnsley,0,0,0,gov_uk,grimethorpe biomass gasification power plant 41,repd_project_40,private developer,the yeld biomass project,biomass (dedicated),1.0,abandoned,"the yeld, lions hall, kingston,",hereford and worcester,west midlands,england,hr5 3ly,-2.952766832455781,52.20228244751255,"herefordshire, county of",2005-09-19,0,0,gov_uk,the yeld biomass project 42,repd_project_41,talbotts heating,talbotts heating ltd,biomass (dedicated),1.5,abandoned,"talbotts heating ltd , st albans road , stafford",staffordshire,west midlands,england,0,-2.11270385032846,52.80899467008154,stafford,2000-07-20,0,0,gov_uk,talbotts heating ltd 43,repd_project_42,peninsular power,winkleigh biogas generator,advanced conversion technologies,23.0,appeal withdrawn,"former raf airfield, winkleigh",devon,south west,england,0,-3.966948690333939,50.86746566240218,torridge,0,0,0,gov_uk,winkleigh biogas generator 44,repd_project_43,"western bioenergy, affiliate of western log",western wood energy plant,biomass (dedicated),14.0,operational,"longlands lane, margam, nr junction 38 of the m4.",west glamorgan,wales,wales,0,-3.7626210555485953,51.56753953504322,neath port talbot,2004-04-27,2006-11-01,2009-11-01,gov_uk,western wood energy plant 45,repd_project_44,eccleshal biomass,eccleshall biomass,biomass (dedicated),2.6,operational,"land adjacent to raleigh ind. estate, sturbridge , eccleshal",staffordshire,west midlands,england,st21 6jl,-2.246724783608759,52.874647998240654,stafford,2003-10-29,2006-05-01,2007-09-12,gov_uk,eccleshall biomass 46,repd_project_45,charlton sawmills,charlton sawmill,biomass (dedicated),7.0,abandoned,"charlton sawmill, bideland dinham, nr frome",somerset,south west,england,ba11 2rh,-2.398575559515967,51.26583649766826,somerset,2006-03-31,0,0,gov_uk,charlton sawmill 47,repd_project_46,border biofuels,burnside farm biomass plant,biomass (dedicated),2.5,abandoned,"glen cloy, brodick, isle of arran, north ayrshire",strathclyde,scotland,scotland,0,-5.162784526092429,55.5722857552033,north ayrshire,2001-10-08,0,0,gov_uk,burnside farm biomass plant 48,repd_project_47,epr scotland,westfield biomass power station,biomass (dedicated),12.5,operational,"westfield development centre, fife",fife,scotland,scotland,0,-3.3051099410682068,56.14170091124371,fife,1995-12-05,0,2000-08-21,gov_uk,westfield biomass power station 49,repd_project_48,plymouth hospital nhs trust,derriford hospital,biomass (dedicated),1.5,operational,"derriford hospital, derriford road, derriford, plymouth,",devon,south west,england,pl6 8dh,-4.113684475426827,50.416719948823165,plymouth,2013-12-10,2014-07-10,2014-10-01,gov_uk,derriford hospital 50,repd_project_49,c j day associates,gortahar road,biomass (dedicated),2.5,planning permission expired,"54 gortahar road, gortahar, rasharkin",co. antrim,northern ireland,northern ireland,0,-6.46847146024337,54.96680679448679,causeway coast and glens,2007-10-03,0,0,gov_uk,gortahar road 51,repd_project_50,cofely,rampton hospital energy centre,biomass (dedicated),1.2,operational,"retford,",nottinghamshire,east midlands,england,dn22 0pd,-0.8382125884467737,53.29038534480032,bassetlaw,2013-02-06,2015-02-01,2015-05-29,gov_uk,rampton hospital energy centre 52,repd_project_51,forever fuels,upper geiselittle biomass plant,biomass (dedicated),1.0,abandoned,"upper geiselittle farm, thurso,",highland,scotland,scotland,kw14 8yh,-3.506233814679493,58.56939911271938,highland,2012-08-14,0,0,gov_uk,upper geiselittle biomass plant 53,repd_project_52,oak grove renewables,oak grove biomass facility,anaerobic digestion,2.0,operational,"oak grove, scottow, norwich,",norfolk,eastern,england,nr10 4du,1.3564188800579515,52.768629939523784,north norfolk,2012-09-25,0,2014-03-01,gov_uk,oak grove biomass facility 54,repd_project_53,honda,honda energy centre (biomass),advanced conversion technologies,4.5,abandoned,"highworth road, south marston, swindon",wiltshire,south west,england,sn3 4tz,-1.7339589836823108,51.58858991783545,swindon,2014-03-19,0,0,gov_uk,honda energy centre biomass 55,repd_project_54,bel (ni),sankey valley industrial estate,biomass (dedicated),4.8,application refused,"adj unit 1, sankey valley industrial estate, anglezarke road, newton le willows, merseyside",merseyside,north west,england,wa12 8dj,-2.6399959536140547,53.44804851972918,st. helens,0,0,0,gov_uk,sankey valley industrial estate 56,repd_project_55,unknown,roves farm,biomass (dedicated),2.0,abandoned,"roves farm, roves lane, swindon,",wiltshire,south west,england,sn6 7qf,-1.7067675179989679,51.61287373866808,swindon,2006-11-13,0,0,gov_uk,roves farm 57,repd_project_56,lockwood estates,land at grange farm,anaerobic digestion,1.1,operational,"cliff road, spridlington, market rasen",lincolnshire,east midlands,england,ln8 2dn,-0.5362871852437249,53.33610925114849,west lindsey,2013-06-04,2013-12-01,2014-12-01,gov_uk,land at grange farm 58,repd_project_57,border biofuels,consett power station,biomass (dedicated),10.0,abandoned,"hownsgill industrial estate , consett , durham",county durham,north east,england,0,-1.8349114136799165,54.842901862712324,county durham,2000-04-25,0,0,gov_uk,consett power station 59,repd_project_58,border biofuels,byreshield grains woodgen,biomass (dedicated),6.1,application withdrawn,"byreshield hill , falstone , northumberland",northumberland,north east,england,0,-2.5035824147562065,55.14480617648969,northumberland,0,0,0,gov_uk,byreshield grains woodgen 60,repd_project_59,border biofuels (dynamotive europe),hexham biofuel power station,biomass (dedicated),10.0,application withdrawn,"bridge end , hexham , northumberland",northumberland,north east,england,0,-2.2595912063445684,54.89612378091332,northumberland,0,0,0,gov_uk,hexham biofuel power station 61,repd_project_60,european development corporation,elean business park biomass plant,biomass (dedicated),40.0,operational,elean business park sutton cambridgeshire,cambridgeshire,eastern,england,0,0.12972987690758278,52.397914571699275,east cambridgeshire,1996-02-22,0,2000-09-22,gov_uk,elean business park biomass plant 62,repd_project_61,northern energy developments,dyemill forestry plantation,biomass (dedicated),5.0,application withdrawn,dyemill forestry plantation lamlash brodick isle of arran,strathclyde,scotland,scotland,ka27 8nl,-5.1165506598134565,55.519871876804665,north ayrshire,0,0,0,gov_uk,dyemill forestry plantation 63,repd_project_62,rps planning & development - money,thetford biomass power station 2,biomass (dedicated),40.0,application refused,"land to east of a134, mundford road, thetford",norfolk,eastern,england,0,0.7386648241834486,52.43888535651497,breckland,0,0,0,gov_uk,thetford biomass power station 64,repd_project_63,south western power (novera),eye biomass plant,biomass (dedicated),14.3,operational,"eye biomass plant , eye airfield, site a , eye suffolk",suffolk,eastern,england,0,1.1277608635328502,52.33343741656932,mid suffolk,0,0,1992-07-01,gov_uk,eye biomass plant 65,repd_project_64,cemex,rugby cement works,biomass (dedicated),35.0,abandoned,"rugby cement, lawford road, rugby,",warwickshire,west midlands,england,0,-1.2867623809806434,52.376871839763126,rugby,2007-03-17,0,0,gov_uk,rugby cement works 66,repd_project_65,epr corby / aztec energy,corby biomass plant,biomass (dedicated),14.3,abandoned,"corby biomass plant, phoenix parkway, corby",northamptonshire,east midlands,england,0,-0.6783170707286418,52.50860736609464,north northamptonshire,2001-04-01,0,0,gov_uk,corby biomass plant 67,repd_project_66,university of east anglia,university of east anglia chp,advanced conversion technologies,1.4,abandoned,"uea, norwich",norfolk,eastern,england,nr4 7tj,1.2413910513992856,52.6223694461151,norwich,2007-11-20,0,0,gov_uk,university of east anglia chp 68,repd_project_67,suez energy services,king's yard,biomass (dedicated),3.0,operational,"carpenters road,",london,london,england,e15 2jh,-0.005578513994198582,51.53586045587667,newham,2009-03-10,2009-05-01,2012-07-25,gov_uk,king's yard 69,repd_project_68,eq waste,"eq waste, appspond lane",biomass (dedicated),6.0,abandoned,potters crouch,hertfordshire,eastern,england,0,-0.39267112655833875,51.739888588627394,st albans,2010-05-25,0,0,gov_uk,"eq waste, appspond lane" 70,repd_project_69,navitas environmental (eq waste),appspond lane (resubmission),biomass (dedicated),6.0,planning permission expired,"appspond lane, potters crouch, st. albans,",hertfordshire,eastern,england,al2 3nl,-0.39267112655833875,51.739888588627394,st albans,2010-12-02,0,0,gov_uk,appspond lane resubmission 71,repd_project_70,forth energy,rosyth,biomass (dedicated),120.0,planning permission expired,rosyth port,fife,scotland,scotland,ky11,-3.4383029211400213,56.02307635291396,scottish government (s36),2014-01-24,0,0,gov_uk,rosyth 72,repd_project_71,grangemouth renewable energy,forth ports ltd 2 (grangemouth),biomass (dedicated),85.0,planning permission expired,grangemouth port,falkirk,scotland,scotland,fk3 8uh,-3.710883536628878,56.02496957273207,scottish government (s36),2013-06-03,0,0,gov_uk,forth ports ltd 73,repd_project_72,forth ports,forth ports ltd 4,biomass (dedicated),120.0,application withdrawn,leith docks,lothian,scotland,scotland,0,-3.182174743785984,55.98131081344091,scottish government (s36),0,0,0,gov_uk,forth ports ltd 74,repd_project_73,drax power and siemens project ventures,drax ouse renewable energy park,biomass (dedicated),290.0,abandoned,"selby, north yorkshire",north yorkshire,yorkshire and humber,england,0,-0.9908267564170762,53.747496343274925,north yorkshire,2011-08-10,0,0,gov_uk,drax ouse renewable energy park 75,repd_project_74,drax power and siemens project ventures,drax heron renewable energy park,biomass (dedicated),290.0,abandoned,"land to the north, humber road, killingholme.",humberside,yorkshire and humber,england,0,-0.21531622358969202,53.63876522270775,north lincolnshire,2011-08-10,0,0,gov_uk,drax heron renewable energy park 76,repd_project_75,blyth biomass plant,north blyth biomass power station,biomass (dedicated),99.0,abandoned,"bate's colliery, port of blyth,",northumberland,north east,england,ne24,-1.5102476309302015,55.13548320760111,the planning inspectorate - national infrastructure,2013-07-24,0,0,gov_uk,north blyth biomass power station 77,repd_project_76,dalkia,pollington energy park,biomass (dedicated),53.0,abandoned,"pollington,",west yorkshire,yorkshire and humber,england,0,-1.5237534507112351,53.78199507413595,leeds,2011-12-22,0,0,gov_uk,pollington energy park 78,repd_project_77,bishop's castle biomass power ltd,bishop's castle biomass power project,biomass (dedicated),13.0,abandoned,0,shropshire,west midlands,england,0,-2.992489863542566,52.487799081670275,shropshire,2009-09-04,0,0,gov_uk,bishop's castle biomass power project 79,repd_project_78,boyndie biomass,boyndie airfield biomass,biomass (dedicated),4.0,abandoned,"boyndie, banff, grampian",grampian,scotland,scotland,ab45 2lr,-2.638964003784477,57.66532977882179,aberdeenshire,2010-02-24,0,0,gov_uk,boyndie airfield biomass 80,repd_project_79,hunt's heat & power (bioflame),chequers lane,biomass (dedicated),2.5,abandoned,"75 - 77 chequers lane, dagenham",london,london,england,rm9 6qt,0.14012432326067262,51.53447961461059,barking and dagenham,2008-12-12,0,0,gov_uk,chequers lane 81,repd_project_80,peel energy,corpach biomass energy plant,biomass (dedicated),20.0,abandoned,kilmallie hall corpach fort william,highland,scotland,scotland,ph33 7jh,-5.122471114594175,56.84270469689972,highland,2010-12-09,0,0,gov_uk,corpach biomass energy plant 82,repd_project_81,purepower energy,huntingdon,advanced conversion technologies,4.5,abandoned,"woodhatch farm, thrapston road, ellington, huntingdon",cambridgeshire,eastern,england,pe28 0ae,-0.2995803782811633,52.33402007960782,huntingdonshire,2007-06-25,0,0,gov_uk,huntingdon 83,repd_project_82,kiveton heat and power,kiveton recycling centre,biomass (dedicated),2.5,abandoned,"the old kiveton quarry, dog kennel hill, kiveton, park station",south yorkshire,yorkshire and humber,england,s26 6ng,-1.2413630960304984,53.3383050797913,rotherham,2010-02-03,0,0,gov_uk,kiveton recycling centre 84,repd_project_83,"mvv energie, ridham dock",ridham chp plant,biomass (dedicated),25.0,operational,"ridham dock, iwade, sittingbourne,",kent,south east,england,me9 8sr,0.7588220297660605,51.38233130377889,swale,2012-05-28,2013-04-08,2016-04-18,gov_uk,ridham chp plant 85,repd_project_84,tesco,tesco distribution centre (livingston),biomass (dedicated),6.5,abandoned,"carnegie road, deans industrial estate, livingston",lothian,scotland,scotland,eh54 8tb,-3.5839049382568273,55.9040966370971,west lothian,2010-12-08,0,0,gov_uk,tesco distribution centre livingston 86,repd_project_85,r plevin & sons ltd,r.plevin & sons chp,biomass (dedicated),1.6,application refused,"crookford hill, elkesley, retford",nottinghamshire,east midlands,england,dn22 8bt,-0.9932366344556556,53.27342960734355,bassetlaw,0,0,0,gov_uk,r.plevin sons chp 87,repd_project_86,bioflame,cardiff dock heat and power,biomass (dedicated),2.5,abandoned,"cold stores road, queen alexandra dock",south glamorgan,wales,wales,0,-3.1494698591352055,51.461843001799494,cardiff,2009-02-06,0,0,gov_uk,cardiff dock heat and power 88,repd_project_87,glennmont partners,port clarence biomass plant,biomass (dedicated),40.0,under construction,"port clarence road, port clarence,",cleveland,north east,england,0,-1.2307324739349312,54.587778612934386,stockton-on-tees,2010-02-23,2015-11-17,0,gov_uk,port clarence biomass plant 89,repd_project_88,l&s waste management,pegham renewable energy facility,advanced conversion technologies,2.0,planning permission expired,"units d and e, pegham industrial estate, laveys lane, titchfield,",hampshire,south east,england,0,-1.2118455684718241,50.87634126109882,winchester,2011-04-07,0,0,gov_uk,pegham renewable energy facility 90,repd_project_89,glennmont partners,margam green energy plant,biomass (dedicated),40.0,operational,"longlands lane, margam, port talbot",west glamorgan,wales,wales,0,-3.747885446992546,51.563308821454704,neath port talbot,2011-03-08,2015-02-15,2017-12-01,gov_uk,margam green energy plant 91,repd_project_90,merevale and blyth estates,merevale & blyth estate (biomass plant),biomass (dedicated),2.5,operational,"merevale lane, atherstone,",warwickshire,west midlands,england,cv9 2la,-1.586703831680865,52.57165798198684,north warwickshire,2011-03-28,2014-08-28,2015-03-28,gov_uk,merevale blyth estate biomass plant 92,repd_project_91,lynemouth power,lynemouth power station,biomass (dedicated),420.0,operational,woodhorn ashington northumberland,northumberland,north east,england,ne63 9yh,-1.532504001976289,55.20672173325934,northumberland,2015-03-06,2016-01-01,2018-11-21,gov_uk,lynemouth power station 93,repd_project_92,scottish and southern energy (sse),ferrybridge multifuel 1 (fm1),efw incineration,68.0,operational,"ferrybridge c power station, po box 39, stranglands lane, knottingley,",west yorkshire,yorkshire and humber,england,wf11 8sq,-1.2818852350690881,53.71641723929932,wakefield,2011-10-31,2012-10-01,2015-08-03,gov_uk,ferrybridge multifuel 94,repd_project_93,uye (uk) / veolia,holbrook community renewable energy centre,biomass (dedicated),6.5,operational,"land at rear of hadee engineering co ltd, rother valley way, holbrook, sheffield",south yorkshire,yorkshire and humber,england,s20 3gh,-1.332311180252399,53.33081240267397,sheffield,2012-09-25,2015-07-17,2017-04-24,gov_uk,holbrook community renewable energy centre 95,repd_project_94,alternative use group plc & alchemy farms,riverside industrial estate gasification plant,advanced conversion technologies,10.5,operational,"land at riverside industrial estate, marsh lne, boston,",lincolnshire,east midlands,england,0,-0.012939079273559822,52.957225975990184,boston,2010-09-07,2016-04-04,2018-03-15,gov_uk,riverside industrial estate gasification plant 96,repd_project_95,international power / gdf suez,rugeley power plant conversion,biomass (dedicated),1000.0,abandoned,rugeley,staffordshire,west midlands,england,ws15 1pr,-1.9129710610383732,52.75395602852578,lichfield,2013-01-09,0,0,gov_uk,rugeley power plant conversion 97,repd_project_96,enviroparks operations,enviroparks hirwaun generation site,advanced conversion technologies,20.0,operational,"fifth avenue, hirwaun industrial estate, hirwaun, aberdare,",mid glamorgan,wales,wales,cf44 9yn,-3.538986661345232,51.750094020574444,rhondda cynon taf,2010-12-21,2016-02-18,2019-09-01,gov_uk,enviroparks hirwaun generation 98,repd_project_97,estover energy,cramlington chp,biomass (dedicated),27.7,operational,"windmill industrial estate, cramlington,",northumberland,north east,england,ne23 1jy,-1.620629321573954,55.0969399615995,northumberland,2013-01-21,2015-09-01,2018-03-15,gov_uk,cramlington chp 99,repd_project_98,private developer,tyrone energy 1,biomass (dedicated),2.1,operational,lands 3 art road artigarvan strabane,co. tyrone,northern ireland,northern ireland,bt82 0ha,-7.406464392412203,54.85208565269308,derry city and strabane,2009-12-08,2011-08-01,2012-08-06,gov_uk,tyrone energy 100,repd_project_99,centrica,roosecote biomass,biomass (dedicated),80.0,application withdrawn,"roosecote near barrowin- furness, cumbria. roosecote",cumbria,north west,england,0,-3.189080493406181,54.10515113624058,the planning inspectorate - national infrastructure,0,0,0,gov_uk,roosecote biomass